top of page
logo 3.png

Notable Projects

2004 – 2008 Front Runner North Commuter Rail

  • Relocation and replacement of wet utilities: Jack and bore, 72” storm drains, park and ride utilities.

2004 – East Apron Airport Rehabilitation

  • Drainage Improvements

2007 – Intermodal Hub Project

  • 30” SCCP waterline 2000 linear feet, valve vaults, water and sewer.

2008 – Bear River Bird Refuge Drainage Project

  • 10’x6’ box culvert with inlet and outlet structures, 8’x6’ box culvert with inlet and outlet structures.

2008 – 2012 Front Runner South Commuter Rail

  • Relocation of wet utilities: Waterlines, 12” – 48” jacks  and bores, 10” – 72” split casings, and storm drains.

2008 – 2012 West Valley Traxline

  • Relocation and replacement of wet utilities: Up to 60” storm drains, water lines, sewer lines, 18” – 42” casings, up to 20” ductile iron water lines and sewer lines.

bottom of page