top of page
Notable Projects
2004 – 2008 Front Runner North Commuter Rail
-
Relocation and replacement of wet utilities: Jack and bore, 72” storm drains, park and ride utilities.
2004 – East Apron Airport Rehabilitation
-
Drainage Improvements
2007 – Intermodal Hub Project
-
30” SCCP waterline 2000 linear feet, valve vaults, water and sewer.
2008 – Bear River Bird Refuge Drainage Project
-
10’x6’ box culvert with inlet and outlet structures, 8’x6’ box culvert with inlet and outlet structures.
2008 – 2012 Front Runner South Commuter Rail
-
Relocation of wet utilities: Waterlines, 12” – 48” jacks and bores, 10” – 72” split casings, and storm drains.
2008 – 2012 West Valley Traxline
-
Relocation and replacement of wet utilities: Up to 60” storm drains, water lines, sewer lines, 18” – 42” casings, up to 20” ductile iron water lines and sewer lines.
bottom of page